East China · Behind-the-meter BESS
Petrochemical Plant — Behind-the-meter Storage
Large-scale behind-the-meter storage for an energy-intensive petrochemical base — peak shaving and greater energy flexibility and supply stability.
195 MW / 390 MWh
Case studies
From behind-the-meter storage to integrated solar-storage-charging, every project is invested, built, operated and continuously optimised by Megado — creating long-term value for our customers.
Project pipeline
Beyond the operating portfolio, Megado is advancing a set of larger storage and integrated-energy projects. A representative selection below — still in construction or early development, shown by project scale rather than delivered results.
East China · Behind-the-meter BESS
Large-scale behind-the-meter storage for an energy-intensive petrochemical base — peak shaving and greater energy flexibility and supply stability.
195 MW / 390 MWh
Jiangsu · Independent storage
A shared independent-storage station integrated with solar-storage-charging — grid peak regulation and spot-market trading.
100 MW / 400 MWh
Zhejiang · Independent storage
Large grid-side independent storage providing peak regulation, frequency response and capacity support for a more flexible regional grid.
50 MW / 200 MWh
Guangdong · PV-storage-charging
Rooftop solar, behind-the-meter storage and DC fast-charging combined — self-generated green power plus public charging.
30 MW PV · 60 MWh storage · 640 chargers