Hunan New-Materials Plant Storage

Changde, Hunan2024Industrial BESS

Overview

A 0.785 MW / 1.566 MWh behind-the-meter system for a new-materials manufacturer — 6 vertical liquid-cooled cabinets on Megado's in-house cloud platform — shifting load from valley to peak to lower energy costs and improve supply stability for an energy-intensive plant.

~1 GWh optimised per year

Data sheet

Capacity
0.785 MW / 1.566 MWh
Cabinets
6 台 / units
Operation
15 年 / 15 yrs