MEGADO麦格度
Tianjin Public Transport Hub Solar
← All projects

Tianjin Public Transport Hub Solar

Tianjin2024Distributed solar

Overview

A 'green power station' on the existing buildings and new canopies of an operating public-transport hub — roughly 8,000 panels over about 24,000 ㎡, built without service interruption and grid-connected on first inspection, turning idle space into a win-win benchmark.

5 GWh clean power/yr · 4,000+ t CO₂ avoided/yr

Data sheet

Capacity
5.06 MWp
Panels
~8,000 块 / panels
Operation
25 年 / 25 yrs

Your site could be doing this too

Start with zero capex. Our team studies your energy profile and tailors a storage and integrated-energy solution.

Book a consultation